Public marketing tool
Build vs buy
Compare an all-in Split Rock build (lot + construction + ASSUME soft costs) against public IDX active listings near Rigby. This is not an appraisal — confirm numbers with Split Rock before any decision.
Build path — lot + Split Rock
Default $99,500 from Teton Heights Division #6 published base list price. Editable if your lot differs — confirm live list price with Twin Forks / Split Rock.
Defaults come from the public estimator catalog (Forks 2280). Adjust build cost below for site-specific scope.
Of lot + build
Of build
Of build
Package prices already include Split Rock’s margin, so contingency and P&O start at 0%. Raise them only if you typed a raw hard-cost number above. Soft / closing 2% matches the lot + build estimate. Well, septic, and driveway are not included.
≈ $235 / sf all-in
Buy path — public IDX comps
Filtered comps: 0
Median $/sf needs at least 3 comps with both price and sqft — none in the current filter.
| MLS | Price | Beds | Baths | SF | $/SF |
|---|---|---|---|---|---|
| No listings match these filters. | |||||
0 active list prices · Snake River MLS · Source: archibaldbagley.com public IDX
Showing up to 12 rows; each MLS # opens the listing on archibaldbagley.com. “—” means the feed didn’t provide that field. Active list prices only. No sold prices are shown or estimated.
Equal housing opportunity. Listing data from Snake River Regional MLS via Navica IDX — for consumers working with Archibald-Bagley Real Estate. Not the confidential back-office feed. Information deemed reliable but not guaranteed.
See all listings on archibaldbagley.comDisclaimer
This tool is for education only and is not an appraisal, CMA, or binding bid. Lot defaults cite the published Teton Heights base list price; build cost and soft / contingency / P&O percents are labeled ASSUME until Split Rock confirms a written estimate. IDX rows are typically active listings (list price), not closed sales — sold-comp depth may be limited. Confirm land, well/septic, driveway, permits, and finish scope with Split Rock Construction before relying on any figure.
